Archive milestone artifacts: - milestones/v1.0-ROADMAP.md (full roadmap archive) - milestones/v1.0-REQUIREMENTS.md (26/26 requirements complete) - milestones/v1.0-phases/ (8 phase directories with plans, summaries, verifications) Updated: - PROJECT.md: full evolution review, all consolidation requirements validated - ROADMAP.md: collapsed to milestone summary with archive link - STATE.md: reset for next milestone - MILESTONES.md: created with stats and accomplishments - RETROSPECTIVE.md: created with lessons learned Deleted: - REQUIREMENTS.md (archived, fresh for next milestone) 8 phases, 17 plans, 34 tasks, 84 tests added, 6 days
5.5 KiB
5.5 KiB
Project Retrospective
A living document updated after each milestone. Lessons feed forward into future planning.
Milestone: v1.0 — Consolidation
Shipped: 2026-03-05 Phases: 8 | Plans: 17 | Tasks: 34 Timeline: 6 days (2026-02-27 → 2026-03-05)
What Was Built
- Race-free concurrency across all 4 SetContext entry points
- Honest error handling: startupErr to struct, config permissions, MPRIS logging, scan warning separation
- 84 unit tests covering queue, config, player, FTS5 search, library scan, entity cache
- SQL consolidation: track_metadata VIEW, sqlc.slice() migration, SAFETY comments on 12 hand-crafted queries
- AST-based Go→TypeScript event codegen with pre-commit enforcement
- Incremental queue persistence (O(1) add/remove) and SetQueue Phase 2 dedup
- Deferred library store loading for instant app shell
- Frontend design token system, classMap directives, queueMicrotask coalescing
- Visual consistency audit across all 15 components
What Worked
- Dependency-ordered phases: Fixing races → building test infra → writing tests → refactoring → performance → UX created a clean progression where each phase built on the last
- Characterization tests before refactoring: Writing tests in Phase 4-5 before SQL consolidation in Phase 6 caught zero regressions — the tests were accurate safety nets
- Small, focused plans: 2-3 tasks per plan kept execution fast and context fresh — most plans completed in under 10 minutes
- Research phase for SQL consolidation: Phase 6 research validated sqlc + VIEW + FTS5 compatibility before planning, avoiding mid-execution discovery
- Internal package tests: Testing queue/library as package-internal (not
_testsuffix) gave access to unexported fields for thorough state verification
What Was Inefficient
- Phase 8 repeat() regression: Migrating virtualizers to
repeat()directive in Plan 02 broke virtualization (repeat as child content bypasses lit-virtualizer's DOM management). Required a hotfix (72ef719) reverting to.renderItem+.keyFunction. Research should have caught this API distinction. - Task count tracking: STATE.md only tracked tasks-per-plan for later phases (5-8), making total task count harder to derive at milestone completion
- No startup time measurement: TODO to measure startup time before Phase 7 lazy loading was never done — can't quantify the improvement
Patterns Established
- Mutex-protected setter pattern: Lock → write field → release lock → call callbacks (prevents deadlock from callback re-entry)
- ScanWarning + addWarning pattern: Mutex-protected warning collection for non-fatal errors during long-running operations
- applyPRAGMAs shared function: Single source of truth for SQLite PRAGMAs, shared between production NewDB and test NewTestDB
- SAFETY comment convention: Two-part format (why + safety assurance) for hand-crafted SQL that bypasses sqlc
- AST-based codegen over regex: go/ast + go/parser for cross-language constant synchronization
- Design token CSS custom properties:
--yj-icon-sm/md/lg,--yj-text-xs/sm/md/lg/xlscoped to:hostin Lit components - queueMicrotask coalescing: Batch multiple synchronous store notifications into single subscriber update
Key Lessons
- Test the API contract, not the implementation surface: repeat() inside lit-virtualizer looks correct syntactically but violates the component's rendering contract. Always verify how a library expects to be consumed, not just what compiles.
- Research before planning pays off immediately: Phase 6 research confirmed sqlc + VIEW compatibility, saving mid-execution discovery and potential re-planning.
- Incremental persistence is O(complexity) not O(code): The incremental queue persistence (Phase 7) was conceptually simple but required careful position-shift SQL for insert/remove operations — more thought than code.
- Design tokens must precede visual consistency work: Phase 8 correctly defined tokens in Plan 01 before applying them in Plan 04 — reversing this order would have required double work.
- Contentless FTS5 has deletion limitations: Cannot DELETE from tables with
content=''. Document this in tests rather than fighting it — stale entries are harmless for the use case.
Cost Observations
- Model mix: Primarily opus for planning + execution, sonnet for research
- Total commits: 107 across 6 days
- Notable: Plans averaging 2-6 minutes execution time; Phase 8 Plan 04 (visual audit across 15 components) was the longest at 8 minutes
- Efficiency: 17 plans × ~5 min avg = ~85 min total execution time for 34 tasks across 67 source files
Cross-Milestone Trends
Process Evolution
| Milestone | Days | Phases | Plans | Key Change |
|---|---|---|---|---|
| v1.0 | 6 | 8 | 17 | First milestone — established GSD workflow, research-before-plan pattern |
Cumulative Quality
| Milestone | Tests Added | Total Tests | Key Quality Win |
|---|---|---|---|
| v1.0 | 84 | 84 | From 0 backend tests to comprehensive coverage of queue, config, player, database, library |
Top Lessons (Verified Across Milestones)
- Dependency-ordered phases (fix → test → refactor → optimize) prevent rework and ensure each phase builds on a stable foundation
- Small plans (2-3 tasks, <10 min) maintain consistent quality — no context degradation
- Research phases for unfamiliar domains (sqlc + VIEW, lit-virtualizer API) prevent mid-execution surprises