4.2 KiB
gsd_state_version, milestone, milestone_name, status, last_updated, progress
| gsd_state_version | milestone | milestone_name | status | last_updated | progress | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.1 | Features & Extensibility | roadmap_complete | 2026-03-06 |
|
YellowJacket — Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-03-06)
Core value: The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy. Current focus: v1.1 Features & Extensibility — roadmap complete, ready for planning
Current Position
Phase: 9 — Scan Cancellation & Keyboard Shortcuts Plan: — Status: Ready for planning Progress: ░░░░░░░░░░░░░░░░░░░░ 0/6 phases (0%) Last activity: 2026-03-06 — Roadmap created for v1.1
Phase Overview
| Phase | Status |
|---|---|
| 9. Scan Cancellation & Keyboard Shortcuts | Not started |
| 10. Tag Editing | Not started |
| 11. Smart Playlists | Not started |
| 12. Gapless Playback & Crossfade | Not started |
| 13. MusicBrainz Browser | Not started |
| 14. Layout Customization & Plugin Foundation | Not started |
Performance Metrics
v1.0 baseline: 8 phases, 17 plans, 34 tasks in 6 days (107 commits) v1.1 scope: 6 phases, 43 requirements, ~? plans (TBD during planning)
Accumulated Context
Key Decisions
Decisions from v1.0 are archived in PROJECT.md Key Decisions table. Key patterns to carry forward:
- Mutex-protected setter pattern (lock → write → release → callbacks)
- SAFETY comment convention for hand-crafted SQL
- AST-based codegen for cross-language constant sync
- Design tokens via
:hostscoped CSS custom properties - queueMicrotask coalescing for store notifications
.renderItem+.keyFunction(notrepeat()children) for lit-virtualizer
v1.1 Roadmap Decisions
| Decision | Rationale |
|---|---|
| Phase 9 = Scan Cancel + Shortcuts | Quick wins, validate context cancellation and config extension patterns |
| Phase 10 = Tag Editing after shortcuts | Introduces 3 new deps, file-write-DB-event pipeline; benefits from validated patterns |
| Phase 11 = Smart Playlists after tags | DB patterns, benefits from validated DB update pipeline |
| Phase 12 = Gapless mid-sequence | Highest risk isolated after foundations proven, before meta-features |
| Phase 13 = MusicBrainz after gapless | First network feature, orthogonal to audio work |
| Phase 14 = Layout + Plugins last | Meta-features that wrap all others, need stable API surface |
| Layout + Plugins combined into one phase | Both are extensibility foundations; layout provides component registry that plugins register into |
Warnings (carry forward)
- Player lock ordering (
p.mubeforespeaker.Lock(), goroutine dispatch in beep callback) — CRITICAL for Phase 12 gapless work - modernc.org/libc version must match exactly when updating modernc.org/sqlite
@lit-labs/signalsis experimental (v0.2.0) — not blocking but noted- Tag writing: block edits on currently-playing files (beep holds
*os.Filehandle) — Phase 10 - Scan cancellation: skip orphan cleanup on cancelled scans — Phase 9
- MusicBrainz: strict 1 req/s rate limit, proper User-Agent, SQLite cache — Phase 13
- Plugin system: JS-only for v1.1, recover() wrappers, read-only DB access — Phase 14
- FLAC tag writes load entire file into memory (go-flac) — acceptable for v1.1 — Phase 10
Research Flags
- Phase 12 (Gapless + Crossfade): Needs deeper research — beep Mixer/Seq composition for real-time crossfade not well-documented. Prototype persistent-mixer architecture before committing to implementation.
- Phase 14 (Plugin System): Needs deeper research — plugin API surface design, error containment, security boundaries. Consider spike/prototype.
Session Continuity
Last Session
Date: 2026-03-06
What happened: Created v1.1 roadmap with 6 phases (9-14) covering all 43 requirements. Research summary informed phase ordering. Coverage validated at 43/43.
Where we stopped: Roadmap created, ready for phase planning.
Next action: /gsd-plan-phase 9 — Plan Scan Cancellation & Keyboard Shortcuts
State initialized: 2026-02-27 Last activity: 2026-03-06 - v1.1 roadmap created Last updated: 2026-03-06