YellowJacket — Consolidation Milestone State

Project Reference

Core value: The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy. Current focus: Roadmap created, awaiting Phase 1 planning. Milestone: Consolidation (correctness, performance, code quality, UX polish, test coverage)

Current Position

Phase: — (not started) Plan: — (not started) Status: Roadmap complete, ready for phase planning

Phase Progress: [........] 0/8 phases complete

Performance Metrics

Metric Value
Phases complete 0/8
Plans complete 0/?
Requirements delivered 0/26
Tests added 0
Bugs fixed 0

Accumulated Context

Key Decisions

Decision Rationale Phase
Fix races before tests Can't run -race-clean tests with active data races Phase 1 → 3
PRAGMAs with test infra NewTestDB must mirror production DB setup; PRAGMAs change production NewDB Phase 3
Tests before refactoring Research unanimously recommends characterization tests as safety net Phase 4-5 → 6-7
SQL consolidation after DB tests FTS5 search tests verify VIEW doesn't change ranking Phase 5 → 6
Frontend last Backend API should be stable before frontend adapts Phase 8

TODOs

  • Plan Phase 1 (next step)
  • Validate sqlc + SQLite VIEW + FTS5 compatibility during Phase 6 planning (research flag)
  • Design queue test architecture during Phase 4 planning (research flag)
  • Determine library scan test fixture strategy during Phase 5 planning (research flag)
  • Measure startup time with large library before Phase 7 lazy loading work

Blockers

None currently.

Warnings

  • Player lock ordering (p.mu before speaker.Lock(), goroutine dispatch in beep callback) — do NOT refactor lock-sensitive paths; extract pure logic only
  • modernc.org/libc version must match exactly when updating modernc.org/sqlite
  • @lit-labs/signals is experimental (v0.2.0) — not blocking but noted

Session Continuity

Last Session

Date: 2026-02-27 What happened: Project initialized — codebase analysis, research, requirements definition, roadmap creation Where we stopped: Roadmap created with 8 phases covering 26 requirements Next action: /gsd-plan-phase 1 to create execution plan for Concurrency Race Fixes

Context for Next Session

  • All 26 v1 requirements mapped across 8 phases
  • Dependency chain: correctness → test infra → tests → SQL/perf optimization → frontend
  • Phase 1 is 4 requirements (CORR-01 to CORR-04), all mechanical mutex additions
  • Research says Phase 1 fixes are "textbook race, LOW effort" — standard patterns, skip research-phase

State initialized: 2026-02-27 Last updated: 2026-02-27