2.8 KiB
2.8 KiB
YellowJacket — Consolidation Milestone State
Project Reference
Core value: The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy. Current focus: Roadmap created, awaiting Phase 1 planning. Milestone: Consolidation (correctness, performance, code quality, UX polish, test coverage)
Current Position
Phase: — (not started) Plan: — (not started) Status: Roadmap complete, ready for phase planning
Phase Progress: [........] 0/8 phases complete
Performance Metrics
| Metric | Value |
|---|---|
| Phases complete | 0/8 |
| Plans complete | 0/? |
| Requirements delivered | 0/26 |
| Tests added | 0 |
| Bugs fixed | 0 |
Accumulated Context
Key Decisions
| Decision | Rationale | Phase |
|---|---|---|
| Fix races before tests | Can't run -race-clean tests with active data races |
Phase 1 → 3 |
| PRAGMAs with test infra | NewTestDB must mirror production DB setup; PRAGMAs change production NewDB | Phase 3 |
| Tests before refactoring | Research unanimously recommends characterization tests as safety net | Phase 4-5 → 6-7 |
| SQL consolidation after DB tests | FTS5 search tests verify VIEW doesn't change ranking | Phase 5 → 6 |
| Frontend last | Backend API should be stable before frontend adapts | Phase 8 |
TODOs
- Plan Phase 1 (next step)
- Validate sqlc + SQLite VIEW + FTS5 compatibility during Phase 6 planning (research flag)
- Design queue test architecture during Phase 4 planning (research flag)
- Determine library scan test fixture strategy during Phase 5 planning (research flag)
- Measure startup time with large library before Phase 7 lazy loading work
Blockers
None currently.
Warnings
- Player lock ordering (
p.mubeforespeaker.Lock(), goroutine dispatch in beep callback) — do NOT refactor lock-sensitive paths; extract pure logic only - modernc.org/libc version must match exactly when updating modernc.org/sqlite
@lit-labs/signalsis experimental (v0.2.0) — not blocking but noted
Session Continuity
Last Session
Date: 2026-02-27
What happened: Project initialized — codebase analysis, research, requirements definition, roadmap creation
Where we stopped: Roadmap created with 8 phases covering 26 requirements
Next action: /gsd-plan-phase 1 to create execution plan for Concurrency Race Fixes
Context for Next Session
- All 26 v1 requirements mapped across 8 phases
- Dependency chain: correctness → test infra → tests → SQL/perf optimization → frontend
- Phase 1 is 4 requirements (CORR-01 to CORR-04), all mechanical mutex additions
- Research says Phase 1 fixes are "textbook race, LOW effort" — standard patterns, skip research-phase
State initialized: 2026-02-27 Last updated: 2026-02-27