Files
yellowjacket/.planning/ROADMAP.md
T
yonlu cdf8bff01a docs: restructure v1.1 milestone for multi-library support
- Rename milestone from 'Features & Extensibility' to 'Multi-Library Support'
- Replace old phases 10-14 (TAG/SMRT/GAP/MB/LAYOUT/PLUG) with 20 multi-library requirements (LIB/LSCAN/VIEW/PLAY/DATA)
- Move deferred features to Future Requirements
- Update research files with multi-library research (Stack, Features, Architecture, Pitfalls)
- Architecture: hybrid model (library_id on audio_files only), libraries in DB, sequential scanning, phantom tracks
2026-03-08 11:54:37 -04:00

4.4 KiB

Roadmap: YellowJacket

Created: 2026-02-27 Last updated: 2026-03-08 Current milestone: v1.1 Multi-Library Support

Milestones

  • v1.0 Consolidation — Phases 1-8 (shipped 2026-03-05) — archive
  • 🔄 v1.1 Multi-Library Support — Phase 9 complete, multi-library phases TBD (in progress)

Phases

v1.0 Consolidation (Phases 1-8) — SHIPPED 2026-03-05
  • Phase 1: Concurrency Race Fixes (1/1 plans) — completed 2026-02-28
  • Phase 2: Backend Correctness (2/2 plans) — completed 2026-03-03
  • Phase 3: Test Infrastructure (1/1 plans) — completed 2026-03-04
  • Phase 4: Queue, Config & Player Tests (2/2 plans) — completed 2026-03-04
  • Phase 5: Database & Library Tests (2/2 plans) — completed 2026-03-04
  • Phase 6: SQL Consolidation & Code Quality (3/3 plans) — completed 2026-03-04
  • Phase 7: Backend Performance (2/2 plans) — completed 2026-03-05
  • Phase 8: Frontend Performance & UX (4/4 plans) — completed 2026-03-05

v1.1 Multi-Library Support (Phase 9 + Multi-Library Phases)

  • Phase 9: Scan Cancellation & Keyboard Shortcuts — Cancellable library scans and configurable keyboard shortcuts
  • Phases 10+: Multi-Library Support — TBD (awaiting roadmap creation from gsd-roadmapper)

Phase Details

Phase 9: Scan Cancellation & Keyboard Shortcuts

Goal: Users can control library scans (cancel/pause/resume) and operate the entire app via keyboard Depends on: Nothing (builds on v1.0 foundation) Requirements: SCAN-01, SCAN-02, SCAN-03, KEY-01, KEY-02, KEY-03, KEY-04, KEY-05 Success Criteria (what must be TRUE):

  1. User can click a cancel button during a library scan and the scan stops within seconds — no database corruption, no orphaned tracks
  2. User can pause a running scan and resume it later without re-processing files that were already scanned
  3. Default keyboard shortcuts work immediately after install — play/pause, next/prev, volume up/down, search focus, queue toggle, shuffle, repeat all respond to keys
  4. User can open a settings UI, rebind any shortcut to a different key, and the new binding takes effect immediately — conflicts are warned about before saving
  5. Keyboard shortcuts are context-aware — typing in a search box doesn't trigger player shortcuts (except Escape to blur) Plans: 5 plans Plans:
  • 09-01-PLAN.md — Backend scan control (cancel/pause/resume methods, events, metrics)
  • 09-02-PLAN.md — Backend shortcuts config + frontend keyboard shortcut service
  • 09-03-PLAN.md — Frontend scan control UI (buttons, cancel dialog)
  • 09-04-PLAN.md — Frontend shortcut settings UI (record-style capture, conflict detection)
  • 09-05-PLAN.md — Integration verification checkpoint

Multi-Library Phases (10+)

Awaiting roadmap creation. The gsd-roadmapper will create phased breakdown covering 20 requirements:

  • LIB-01..06 (Library Management)
  • LSCAN-01..05 (Library Scanning)
  • VIEW-01..04 (Unified Presentation)
  • PLAY-01..04 (Playlists & Queue)
  • DATA-01..04 (Data Integrity)

Architecture decisions:

  • Hybrid model: library_id FK on audio_files only; artists/albums/genres stay global
  • Libraries stored in SQLite, not TOML config
  • Sequential scanning (one library at a time)
  • Phantom tracks for playlist preservation on library removal
  • Backend filtering for library views

See .planning/research/SUMMARY.md for full research.

Progress

Phase Milestone Plans Complete Status Completed
1. Concurrency Race Fixes v1.0 1/1 Complete 2026-02-28
2. Backend Correctness v1.0 2/2 Complete 2026-03-03
3. Test Infrastructure v1.0 1/1 Complete 2026-03-04
4. Queue, Config & Player Tests v1.0 2/2 Complete 2026-03-04
5. Database & Library Tests v1.0 2/2 Complete 2026-03-04
6. SQL Consolidation & Code Quality v1.0 3/3 Complete 2026-03-04
7. Backend Performance v1.0 2/2 Complete 2026-03-05
8. Frontend Performance & UX v1.0 4/4 Complete 2026-03-05
9. Scan Cancellation & Keyboard Shortcuts v1.1 5/5 Complete 2026-03-07
10+ Multi-Library phases v1.1 0/? Awaiting roadmap -

Roadmap created: 2026-02-27 Last updated: 2026-03-08 — v1.1 restructured for multi-library support, old phases 10-14 deferred