Phase 14 Plan 03: Render & Store Optimization Summary
Event delegation eliminates per-scroll-frame closure allocation; queueMicrotask batching and changeGeneration counter reduce unnecessary re-renders
Performance
- Duration: 4 min
- Started: 2026-03-14T17:49:45Z
- Completed: 2026-03-14T17:54:13Z
- Tasks: 2
- Files modified: 5
Accomplishments
- Eliminated all inline arrow function closures from
renderTrackRow(track-list) andrenderTrackItem(queue-panel), removing GC pressure during rapid scrolling - Added queueMicrotask-based notification batching to queue store, matching the library store pattern
- Added changeGeneration counter to library store so LibraryController skips requestUpdate when only loading flags toggle (no actual data change)
- Confirmed cover-grid already uses event delegation — no changes needed
Task Commits
Each task was committed atomically:
- Task 1: Eliminate per-item closure allocation in render hot paths -
2f7ed70(perf) - Task 2: Add notification batching to queue store and granular subscriptions to library store -
d0c05dc(perf)
Files Created/Modified
frontend/src/components/track-list/track-list.ts- Event delegation via data-index; removed 5 inline closures per row from renderTrackRowfrontend/src/components/queue-panel/queue-panel.ts- Event delegation via data-index; removed 5 inline closures per item from renderTrackItemfrontend/src/store/queue-store.ts- queueMicrotask batching for notify()frontend/src/store/library-store.ts- changeGeneration counter incremented on actual data changesfrontend/src/store/controllers/library-controller.ts- Checks changeGeneration before requestUpdate
Decisions Made
- Event delegation via data-index + closest() — chosen over per-row bound method references because it requires zero function objects in renderItem, not just stable ones. The virtualizer and its children share the same shadow root so event.target.closest() works correctly.
- changeGeneration counter — chosen over typed per-data subscriptions (subscribeTo('tracks')) because it's simpler, backward-compatible, and eliminates the biggest source of unnecessary re-renders (loading flag transitions during eagerFetch cause 8+ requestUpdate calls) without requiring store API changes for existing subscribers.
Deviations from Plan
Auto-fixed Issues
1. [Rule 1 - Bug] Removed unused handleRemoveTrack method
- Found during: Task 1 (queue-panel event delegation)
- Issue: After delegating remove-button click to the virtualizer handler, the old
handleRemoveTrackmethod became unused, causing a TypeScript error (TS6133) - Fix: Removed the unused method; remove logic is now in
onDelegatedClickwhich checksclosest('.remove-button') - Files modified: frontend/src/components/queue-panel/queue-panel.ts
- Verification: Build passes, pre-commit typecheck passes
- Committed in:
2f7ed70(Task 1 commit)
Total deviations: 1 auto-fixed (1 bug) Impact on plan: Trivial cleanup of dead code after refactoring. No scope creep.
Issues Encountered
None
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- Plans 14-01, 14-02, 14-03 complete
- Ready for 14-04 (remaining rendering optimizations)
Self-Check: PASSED
All 5 modified files verified on disk. Both task commits (2f7ed70, d0c05dc) verified in git history.
Phase: 14-performance-optimization Completed: 2026-03-14