yonlu 9943ae381c docs(08-04): complete visual consistency audit & design token application plan
- SUMMARY.md documents 15-component design token rollout
- STATE.md updated: all 8 phases complete, 26/26 requirements delivered
- ROADMAP.md updated: Phase 8 4/4 plans complete
- Includes hotfix documentation for repeat() virtualizer regression (72ef719)
2026-03-05 09:16:22 -05:00

9.5 KiB

gsd_state_version, milestone, milestone_name, status, last_updated, progress
gsd_state_version milestone milestone_name status last_updated progress
1.0 v1.0 milestone complete 2026-03-05T14:13:19Z
total_phases completed_phases total_plans completed_plans
8 8 17 17

YellowJacket — Consolidation Milestone State

Project Reference

Core value: The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy. Current focus: All 8 phases complete. All 26 consolidation milestone requirements delivered. Ready for milestone completion. Milestone: Consolidation (correctness, performance, code quality, UX polish, test coverage)

Current Position

Phase: 08-frontend-performance-ux Plan: 4/4 (All plans complete) Status: Complete

Phase Progress: [########] 8/8 phases — All phases complete ✓

Performance Metrics

Metric Value
Phases complete 7/8
Plans complete 4/4 (Phase 8)
Requirements delivered 26/26
Tests added 84
Bugs fixed 9
01-01 duration 11 min
02-01 duration 12 min
02-02 duration 50 min
03-01 duration 3 min
04-01 duration 3 min
04-02 duration 4 min
05-01 duration 9 min
05-02 duration 4 min
Phase 05 P01 9 min
Phase 05 P02 4 min
Phase 06 P01 2 min
Phase 06 P02 2 min
Phase 06 P03 6 min
Phase 07 P01 5 min
Phase 07 P02 1 min
Phase 08 P01 1 min
Phase 08 P02 3 min
Phase 08 P03 2 min
Phase 08 P04 8 min

Accumulated Context

Key Decisions

Decision Rationale Phase
Fix races before tests Can't run -race-clean tests with active data races Phase 1 → 3
PRAGMAs with test infra NewTestDB must mirror production DB setup; PRAGMAs change production NewDB Phase 3
Tests before refactoring Research unanimously recommends characterization tests as safety net Phase 4-5 → 6-7
SQL consolidation after DB tests FTS5 search tests verify VIEW doesn't change ranking Phase 5 → 6
Frontend last Backend API should be stable before frontend adapts Phase 8
Release mutex before Wails runtime calls Library/Playlist SetContext releases lock before registerEventHandlers/migrateExistingPlaylists to avoid blocking Phase 1
Player SetContext single-lock Collapsed double-lock to prevent partially-initialized observable state Phase 1
MPRIS closures inline, Warn level Non-fatal OS media control failures logged at Warn, kept as inline closures Phase 2
Pass metrics through cachedLinkArtist Consistent void-return pattern; warnings collected via addWarning Phase 2
Fatal vs warning error classification tx.Commit failures are fatal; all other scan errors are warnings in ScanMetrics Phase 2
applyPRAGMAs unexported, shared Package-internal function ensures NewDB and NewTestDB have identical PRAGMA config Phase 3
NewTestDB uses t.Fatalf not error return Test DB setup failures are always fatal — no partial test execution Phase 3
Internal queue tests (package queue) Access unexported fields (shuffleOrder, mu) for thorough state verification Phase 4
Persistence roundtrip verifies shuffleOrder JSON Safety net for Phase 7 incremental persistence refactoring Phase 4
Volume roundtrip ±1 tolerance ToUserVolume uses int truncation not rounding, causing up to 1 unit drift Phase 4
Direct Library construction in tests Bypasses Config.Validate os.Stat; entity cache functions only need ctx + db Phase 5
Contentless FTS5 DELETE limitation DeleteSearchIndex errors on content='' tables; production logs warning, stale entries are harmless Phase 5
SQLite VIEW for JOIN dedup track_metadata VIEW consolidates 5-table JOIN; migration2 keeps inline JOIN for upgrade path Phase 6
AST-based event codegen Iterate f.Decls directly for deterministic declaration-order output; atomic writes via temp+rename Phase 6
sqlc.slice() for batch lookups LookupTrackMetaByPaths uses track_metadata VIEW; chunking preserved at 900 since sqlc.slice() doesn't auto-chunk Phase 6
SAFETY comment convention Two-part format (why + safety assurance); cross-references from library.go/rescan.go to search.go Phase 6
DOMContentLoaded over load event Fires earlier (after HTML parsed) without waiting for all resources; still defers past module evaluation Phase 7
Incremental persistence for single-item mutations Single-track add/remove use INSERT/DELETE + position shift; bulk ops keep full rewrite Phase 7
Hand-crafted SQL for variable-N position shift sqlc ShiftQueuePositionsUp only shifts by 1; variable-N needs raw UPDATE with SAFETY comment Phase 7
queueMicrotask coalescing over setTimeout Synchronous microtask batching is more predictable and lower latency than macrotask scheduling Phase 8
150ms search debounce with instant clear Balances responsiveness with computation cost; empty clears are immediate for snappy UX Phase 8
:host scoped design tokens Component-level token scope matches Lit's shadow DOM encapsulation model Phase 8
Inline repeat() keys over gridKeyFunction Dead method removal; key logic is cleaner inline in repeat() calls Phase 8
classMap over array filter/join Eliminates per-row array allocation; classMap diffs internally for efficient DOM updates Phase 8
Hoist search term outside cols.map Avoids redundant property access per column per row in render hot path Phase 8
em→px with 16px base for sidebar Eliminates compound inheritance issues from nested em values Phase 8
.renderItem+.keyFunction over repeat() for virtualizers repeat() as child content bypasses virtualization; .renderItem is the proper lit-virtualizer API Phase 8
Cover-grid dynamic text tiers mapped to type scale updateSizeProperties() uses --yj-text-xs/sm/md/lg tokens instead of hardcoded px Phase 8

TODOs

  • Plan Phase 1 (complete)
  • Execute Phase 1 Plan 01 (complete)
  • Plan Phase 2 (complete)
  • Execute Phase 2 Plan 01 (complete)
  • Execute Phase 2 Plan 02 (complete)
  • Plan Phase 3 (complete)
  • Execute Phase 3 Plan 01 (complete)
  • Validate sqlc + SQLite VIEW + FTS5 compatibility during Phase 6 planning (validated — sqlc generates TrackMetadatum model, all tests pass)
  • Design queue test architecture during Phase 4 planning (complete)
  • Determine library scan test fixture strategy during Phase 5 planning (complete — inline construction, setupTestLibrary helper)
  • Measure startup time with large library before Phase 7 lazy loading work

Blockers

None currently.

Warnings

  • Player lock ordering (p.mu before speaker.Lock(), goroutine dispatch in beep callback) — do NOT refactor lock-sensitive paths; extract pure logic only
  • modernc.org/libc version must match exactly when updating modernc.org/sqlite
  • @lit-labs/signals is experimental (v0.2.0) — not blocking but noted

Quick Tasks Completed

# Description Date Commit Directory
001 Multi-playlist import support 2026-02-28 50c8a33 001-multi-playlist-import-support
002 Auto-rename duplicate playlists on import 2026-02-28 8ba8bbe 002-auto-rename-duplicate-playlists-on-import
003 Add multi-select to playlist view with context menu delete support 2026-02-28 c92ced2 3-add-multi-select-to-playlist-view-with-c
004 Add "set as default playlist" context menu option for single playlist selection 2026-02-28 9971b63 4-add-set-as-default-playlist-context-menu
005 Add sort dropdown to playlist view 2026-03-01 5c07485 5-add-sort-dropdown-to-playlist-view
006 Remove list icon from playlist names, add favorites icon to default 2026-03-01 3c19766 6-remove-list-icon-from-playlist-names-and
007 Pin default playlist to top of playlist view 2026-03-01 e6378e1 7-pin-default-playlist-to-top-of-playlist-
008 Add duplicate tracks dialog to playlist 2026-03-01 917a79a 8-add-duplicate-tracks-dialog-to-playlist

Session Continuity

Last Session

Date: 2026-03-05 What happened: Executed Phase 8 Plan 04 — visual consistency audit and design token application across 15 components. Also hotfixed repeat() virtualizer regression from Plan 02 (commit 72ef719). Where we stopped: Completed 08-04-PLAN.md (3 tasks, human-verified). All 8 phases complete. All 26 requirements delivered. Next action: Milestone completion

Context for Next Session

  • All 8 phases complete, all 17 plans executed
  • All 26 consolidation milestone requirements delivered
  • Critical hotfix: repeat() inside lit-virtualizer defeated virtualization (72ef719)
  • Ready for /gsd-complete-milestone

State initialized: 2026-02-27 Last activity: 2026-03-05 - Completed 08-04: Visual consistency audit & design token application (Phase 8 complete) Last updated: 2026-03-05