Files
yellowjacket/.planning/STATE.md
T

5.2 KiB

gsd_state_version, milestone, milestone_name, status, last_updated, progress
gsd_state_version milestone milestone_name status last_updated progress
1.0 v1.1 Features & Extensibility unknown 2026-03-07T15:12:59.202Z
total_phases completed_phases total_plans completed_plans
1 1 5 5

YellowJacket — Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-03-06)

Core value: The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy. Current focus: v1.1 Features & Extensibility — Phase 9 complete

Current Position

Phase: 9 — Scan Cancellation & Keyboard Shortcuts Plan: 5 of 5 Status: Complete Progress: ████████████████████ 5/5 plans (100%) Last activity: 2026-03-07 — Completed 09-05 (integration testing & verification)

Phase Overview

Phase Status
9. Scan Cancellation & Keyboard Shortcuts Complete (5/5 plans)
10. Tag Editing Not started
11. Smart Playlists Not started
12. Gapless Playback & Crossfade Not started
13. MusicBrainz Browser Not started
14. Layout Customization & Plugin Foundation Not started

Performance Metrics

v1.0 baseline: 8 phases, 17 plans, 34 tasks in 6 days (107 commits) v1.1 scope: 6 phases, 43 requirements, 5 plans (Phase 9)

Phase Plan Duration Tasks Files
09-01 scan control backend 16 min 2 5
09-02 keyboard shortcuts config & service 35 min 2 12
09-04 keyboard shortcuts settings UI 5 min 2 2
09-03 scan control UI 2 min 1 3
09-05 integration testing & verification 3 min 2 1

Accumulated Context

Key Decisions

Decisions from v1.0 are archived in PROJECT.md Key Decisions table. Key patterns to carry forward:

  • Mutex-protected setter pattern (lock → write → release → callbacks)
  • SAFETY comment convention for hand-crafted SQL
  • AST-based codegen for cross-language constant sync
  • Design tokens via :host scoped CSS custom properties
  • queueMicrotask coalescing for store notifications
  • .renderItem + .keyFunction (not repeat() children) for lit-virtualizer

v1.1 Roadmap Decisions

Decision Rationale
Phase 9 = Scan Cancel + Shortcuts Quick wins, validate context cancellation and config extension patterns
Phase 10 = Tag Editing after shortcuts Introduces 3 new deps, file-write-DB-event pipeline; benefits from validated patterns
Phase 11 = Smart Playlists after tags DB patterns, benefits from validated DB update pipeline
Phase 12 = Gapless mid-sequence Highest risk isolated after foundations proven, before meta-features
Phase 13 = MusicBrainz after gapless First network feature, orthogonal to audio work
Phase 14 = Layout + Plugins last Meta-features that wrap all others, need stable API surface
Layout + Plugins combined into one phase Both are extensibility foundations; layout provides component registry that plugins register into

Warnings (carry forward)

  • Player lock ordering (p.mu before speaker.Lock(), goroutine dispatch in beep callback) — CRITICAL for Phase 12 gapless work
  • modernc.org/libc version must match exactly when updating modernc.org/sqlite
  • @lit-labs/signals is experimental (v0.2.0) — not blocking but noted
  • Tag writing: block edits on currently-playing files (beep holds *os.File handle) — Phase 10
  • Scan cancellation: skip orphan cleanup on cancelled scans — Phase 9 (implemented in 09-01)
  • Volume mutations (ChangeVolume/MuteToggle) must emit events + persist state — Phase 9 (fixed in 09-05)
  • MusicBrainz: strict 1 req/s rate limit, proper User-Agent, SQLite cache — Phase 13
  • Plugin system: JS-only for v1.1, recover() wrappers, read-only DB access — Phase 14
  • FLAC tag writes load entire file into memory (go-flac) — acceptable for v1.1 — Phase 10

Research Flags

  • Phase 12 (Gapless + Crossfade): Needs deeper research — beep Mixer/Seq composition for real-time crossfade not well-documented. Prototype persistent-mixer architecture before committing to implementation.
  • Phase 14 (Plugin System): Needs deeper research — plugin API surface design, error containment, security boundaries. Consider spike/prototype.

Session Continuity

Last Session

Date: 2026-03-07 What happened: Completed 09-05-PLAN.md — integration testing & verification. All automated checks passed. Human verification approved all 23 test scenarios. Fixed volume data flow bug (ChangeVolume/MuteToggle missing event emission and state persistence). Where we stopped: Completed 09-05-PLAN.md — Phase 9 complete Next action: /gsd-plan-phase 10 — Plan Phase 10 (Tag Editing)


State initialized: 2026-02-27

Quick Tasks Completed

# Description Date Commit Directory
16 add ctrl+a hotkey to multi-select views to select all items 2026-03-07 043c74c 16-add-ctrl-a-hotkey-to-multi-select-views-

Last activity: 2026-03-07 - Completed quick task 16: add ctrl+a hotkey to multi-select views to select all items Last updated: 2026-03-07