--- gsd_state_version: 1.0 milestone: v1.1 milestone_name: Features & Extensibility status: in_progress last_updated: "2026-03-07" progress: total_phases: 6 completed_phases: 1 total_plans: 5 completed_plans: 5 --- # YellowJacket — Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-03-06) **Core value:** The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy. **Current focus:** v1.1 Features & Extensibility — Phase 9 complete ## Current Position Phase: 9 — Scan Cancellation & Keyboard Shortcuts Plan: 5 of 5 Status: Complete Progress: ████████████████████ 5/5 plans (100%) Last activity: 2026-03-07 — Completed 09-05 (integration testing & verification) ### Phase Overview | Phase | Status | |-------|--------| | 9. Scan Cancellation & Keyboard Shortcuts | Complete (5/5 plans) ✅ | | 10. Tag Editing | Not started | | 11. Smart Playlists | Not started | | 12. Gapless Playback & Crossfade | Not started | | 13. MusicBrainz Browser | Not started | | 14. Layout Customization & Plugin Foundation | Not started | ## Performance Metrics **v1.0 baseline:** 8 phases, 17 plans, 34 tasks in 6 days (107 commits) **v1.1 scope:** 6 phases, 43 requirements, 5 plans (Phase 9) | Phase | Plan | Duration | Tasks | Files | |-------|------|----------|-------|-------| | 09-01 | scan control backend | 16 min | 2 | 5 | | 09-02 | keyboard shortcuts config & service | 35 min | 2 | 12 | | 09-04 | keyboard shortcuts settings UI | 5 min | 2 | 2 | | 09-03 | scan control UI | 2 min | 1 | 3 | | 09-05 | integration testing & verification | 3 min | 2 | 1 | ## Accumulated Context ### Key Decisions Decisions from v1.0 are archived in PROJECT.md Key Decisions table. Key patterns to carry forward: - Mutex-protected setter pattern (lock → write → release → callbacks) - SAFETY comment convention for hand-crafted SQL - AST-based codegen for cross-language constant sync - Design tokens via `:host` scoped CSS custom properties - queueMicrotask coalescing for store notifications - `.renderItem` + `.keyFunction` (not `repeat()` children) for lit-virtualizer ### v1.1 Roadmap Decisions | Decision | Rationale | |----------|-----------| | Phase 9 = Scan Cancel + Shortcuts | Quick wins, validate context cancellation and config extension patterns | | Phase 10 = Tag Editing after shortcuts | Introduces 3 new deps, file-write-DB-event pipeline; benefits from validated patterns | | Phase 11 = Smart Playlists after tags | DB patterns, benefits from validated DB update pipeline | | Phase 12 = Gapless mid-sequence | Highest risk isolated after foundations proven, before meta-features | | Phase 13 = MusicBrainz after gapless | First network feature, orthogonal to audio work | | Phase 14 = Layout + Plugins last | Meta-features that wrap all others, need stable API surface | | Layout + Plugins combined into one phase | Both are extensibility foundations; layout provides component registry that plugins register into | ### Warnings (carry forward) - Player lock ordering (`p.mu` before `speaker.Lock()`, goroutine dispatch in beep callback) — CRITICAL for Phase 12 gapless work - modernc.org/libc version must match exactly when updating modernc.org/sqlite - `@lit-labs/signals` is experimental (v0.2.0) — not blocking but noted - Tag writing: block edits on currently-playing files (beep holds `*os.File` handle) — Phase 10 - Scan cancellation: skip orphan cleanup on cancelled scans — Phase 9 ✅ (implemented in 09-01) - Volume mutations (ChangeVolume/MuteToggle) must emit events + persist state — Phase 9 ✅ (fixed in 09-05) - MusicBrainz: strict 1 req/s rate limit, proper User-Agent, SQLite cache — Phase 13 - Plugin system: JS-only for v1.1, recover() wrappers, read-only DB access — Phase 14 - FLAC tag writes load entire file into memory (go-flac) — acceptable for v1.1 — Phase 10 ### Research Flags - **Phase 12 (Gapless + Crossfade):** Needs deeper research — beep Mixer/Seq composition for real-time crossfade not well-documented. Prototype persistent-mixer architecture before committing to implementation. - **Phase 14 (Plugin System):** Needs deeper research — plugin API surface design, error containment, security boundaries. Consider spike/prototype. ## Session Continuity ### Last Session **Date:** 2026-03-07 **What happened:** Completed 09-05-PLAN.md — integration testing & verification. All automated checks passed. Human verification approved all 23 test scenarios. Fixed volume data flow bug (ChangeVolume/MuteToggle missing event emission and state persistence). **Where we stopped:** Completed 09-05-PLAN.md — Phase 9 complete **Next action:** `/gsd-plan-phase 10` — Plan Phase 10 (Tag Editing) --- *State initialized: 2026-02-27* Last activity: 2026-03-07 - Completed Phase 9 (scan cancellation & keyboard shortcuts) *Last updated: 2026-03-07*