--- gsd_state_version: 1.0 milestone: v1.1 milestone_name: Features & Extensibility status: in_progress last_updated: "2026-03-07" progress: total_phases: 6 completed_phases: 0 total_plans: 5 completed_plans: 1 --- # YellowJacket — Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-03-06) **Core value:** The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy. **Current focus:** v1.1 Features & Extensibility — Phase 9 in progress ## Current Position Phase: 9 — Scan Cancellation & Keyboard Shortcuts Plan: 2 of 5 Status: In progress Progress: █░░░░░░░░░░░░░░░░░░░ 1/5 plans (20%) Last activity: 2026-03-07 — Completed 09-01 (scan control backend) ### Phase Overview | Phase | Status | |-------|--------| | 9. Scan Cancellation & Keyboard Shortcuts | In Progress (1/5 plans) | | 10. Tag Editing | Not started | | 11. Smart Playlists | Not started | | 12. Gapless Playback & Crossfade | Not started | | 13. MusicBrainz Browser | Not started | | 14. Layout Customization & Plugin Foundation | Not started | ## Performance Metrics **v1.0 baseline:** 8 phases, 17 plans, 34 tasks in 6 days (107 commits) **v1.1 scope:** 6 phases, 43 requirements, 5 plans (Phase 9) | Phase | Plan | Duration | Tasks | Files | |-------|------|----------|-------|-------| | 09-01 | scan control backend | 16 min | 2 | 5 | ## Accumulated Context ### Key Decisions Decisions from v1.0 are archived in PROJECT.md Key Decisions table. Key patterns to carry forward: - Mutex-protected setter pattern (lock → write → release → callbacks) - SAFETY comment convention for hand-crafted SQL - AST-based codegen for cross-language constant sync - Design tokens via `:host` scoped CSS custom properties - queueMicrotask coalescing for store notifications - `.renderItem` + `.keyFunction` (not `repeat()` children) for lit-virtualizer ### v1.1 Roadmap Decisions | Decision | Rationale | |----------|-----------| | Phase 9 = Scan Cancel + Shortcuts | Quick wins, validate context cancellation and config extension patterns | | Phase 10 = Tag Editing after shortcuts | Introduces 3 new deps, file-write-DB-event pipeline; benefits from validated patterns | | Phase 11 = Smart Playlists after tags | DB patterns, benefits from validated DB update pipeline | | Phase 12 = Gapless mid-sequence | Highest risk isolated after foundations proven, before meta-features | | Phase 13 = MusicBrainz after gapless | First network feature, orthogonal to audio work | | Phase 14 = Layout + Plugins last | Meta-features that wrap all others, need stable API surface | | Layout + Plugins combined into one phase | Both are extensibility foundations; layout provides component registry that plugins register into | ### Warnings (carry forward) - Player lock ordering (`p.mu` before `speaker.Lock()`, goroutine dispatch in beep callback) — CRITICAL for Phase 12 gapless work - modernc.org/libc version must match exactly when updating modernc.org/sqlite - `@lit-labs/signals` is experimental (v0.2.0) — not blocking but noted - Tag writing: block edits on currently-playing files (beep holds `*os.File` handle) — Phase 10 - Scan cancellation: skip orphan cleanup on cancelled scans — Phase 9 ✅ (implemented in 09-01) - MusicBrainz: strict 1 req/s rate limit, proper User-Agent, SQLite cache — Phase 13 - Plugin system: JS-only for v1.1, recover() wrappers, read-only DB access — Phase 14 - FLAC tag writes load entire file into memory (go-flac) — acceptable for v1.1 — Phase 10 ### Research Flags - **Phase 12 (Gapless + Crossfade):** Needs deeper research — beep Mixer/Seq composition for real-time crossfade not well-documented. Prototype persistent-mixer architecture before committing to implementation. - **Phase 14 (Plugin System):** Needs deeper research — plugin API surface design, error containment, security boundaries. Consider spike/prototype. ## Session Continuity ### Last Session **Date:** 2026-03-07 **What happened:** Executed 09-01-PLAN.md — scan control backend. Added CancelScan/PauseScan/ResumeScan methods, per-scan cancellable context, pause checkpoints, and 3 new scan lifecycle events. **Where we stopped:** Completed 09-01-PLAN.md **Next action:** `/gsd-execute-phase 9` — Execute Plan 02 (keyboard shortcuts config) --- *State initialized: 2026-02-27* Last activity: 2026-03-07 - Completed 09-01 scan control backend *Last updated: 2026-03-07*