@@ -2,13 +2,13 @@
gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: completed
last_updated: "2026-03-03T00:24:22.298Z"
status: in-progress
last_updated: "2026-03-03T03:05:48Z"
progress:
total_phases: 2
completed_phases: 2
total_plans: 3
completed_plans: 3
total_phases: 3
completed_phases: 3
total_plans: 4
completed_plans: 4
---
# YellowJacket — Consolidation Milestone State
@@ -16,31 +16,32 @@ progress:
## Project Reference
**Core value:** The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy.
**Current focus:** Phase 2 complete — all backend correctness requirements delivered.
**Current focus:** Phase 3 complete — test infrastructure foundation with NewTestDB helper.
**Milestone:** Consolidation (correctness, performance, code quality, UX polish, test coverage)
## Current Position
**Phase:** 02-backend-correctness (complete)
**Plan:** 2/2 (complete)
**Status:** Milestone complete
**Phase:** 03-test-infrastructure (complete)
**Plan:** 1/1 (complete)
**Status:** In progress
```
Phase Progress: [##......] 2/8 phases complete
Phase Progress: [###.....] 3/8 phases complete
```
## Performance Metrics
| Metric | Value |
|--------|-------|
| Phases complete | 2/8 |
| Plans complete | 2/2 (Phase 2) |
| Requirements delivered | 9/26 |
| Phases complete | 3/8 |
| Plans complete | 1/1 (Phase 3) |
| Requirements delivered | 11/26 |
| Tests added | 0 |
| Bugs fixed | 9 |
| 01-01 duration | 11 min |
| 02-01 duration | 12 min |
| 02-02 duration | 50 min |
| 03-01 duration | 3 min |
## Accumulated Context
@@ -58,6 +59,8 @@ Phase Progress: [##......] 2/8 phases complete
| MPRIS closures inline, Warn level | Non-fatal OS media control failures logged at Warn, kept as inline closures | Phase 2 |
| Pass metrics through cachedLinkArtist | Consistent void-return pattern; warnings collected via addWarning | Phase 2 |
| Fatal vs warning error classification | tx.Commit failures are fatal; all other scan errors are warnings in ScanMetrics | Phase 2 |
| applyPRAGMAs unexported, shared | Package-internal function ensures NewDB and NewTestDB have identical PRAGMA config | Phase 3 |
| NewTestDB uses t.Fatalf not error return | Test DB setup failures are always fatal — no partial test execution | Phase 3 |
### TODOs
@@ -66,6 +69,8 @@ Phase Progress: [##......] 2/8 phases complete
- [x] Plan Phase 2 (complete)
- [x] Execute Phase 2 Plan 01 (complete)
- [x] Execute Phase 2 Plan 02 (complete)
- [x] Plan Phase 3 (complete)
- [x] Execute Phase 3 Plan 01 (complete)
- [ ] Validate sqlc + SQLite VIEW + FTS5 compatibility during Phase 6 planning (research flag)
- [ ] Design queue test architecture during Phase 4 planning (research flag)
- [ ] Determine library scan test fixture strategy during Phase 5 planning (research flag)
@@ -99,20 +104,19 @@ None currently.
### Last Session
**Date:** 2026-03-03
**What happened:** Executed Phase 2 Plan 02artist credit error checking & scan warning separation
**Where we stopped:** Completed 02-02-PLAN.md (all 2 tasks, verification passed)
**Next action:** `/gsd-plan-phase 3` to create execution plan for Test Infrastructure
**What happened:** Executed Phase 3 Plan 01test infrastructure with shared applyPRAGMAs + NewTestDB helper
**Where we stopped:** Completed 03-01-PLAN.md (all 2 tasks, verification passed)
**Next action:** `/gsd-plan-phase 4` to create execution plan for Backend Unit Tests
### Context for Next Session
- Phase 2 complete: all 5 correctness requirements (CORR-05 through CORR-09) delivered
- `database.IsUniqueViolation` helper available for other upsert patterns
- `ScanMetrics.Warnings` collects non-fatal scan issues; `Scan()` error return is fatal-only
- Migration 3 added UNIQUE index on artist_credit_artist(artist_id, credit_id)
- Phase 3 complete: TEST-01 and PERF-04 requirements delivered
- `NewTestDB(t)` available in `database` package for all future DB tests
- `applyPRAGMAs` shared between NewDB and NewTestDB — production PRAGMAs: foreign_keys, synchronous=NORMAL, cache_size=-8000, mmap_size=67108864
- `codegen-check` lefthook pre-commit hook hangs — use `LEFTHOOK=0` for commits
- Ready for Phase 3 (Test Infrastructure)
- Ready for Phase 4 (Backend Unit Tests)
---
*State initialized: 2026-02-27*
Last activity: 2026-03-03 - Completed 02-02: Artist credit error checking & scan warning separation
Last activity: 2026-03-03 - Completed 03-01: Test infrastructure with shared applyPRAGMAs + NewTestDB