docs(08-01): complete performance plumbing and design tokens plan
This commit is contained in:
@@ -32,7 +32,7 @@ Requirements for the consolidation milestone. Each maps to roadmap phases.
|
|||||||
- [x] **PERF-02**: SetQueue Phase 2 (resolveRemainingTracks) skips file paths already resolved in Phase 1, avoiding redundant database lookups
|
- [x] **PERF-02**: SetQueue Phase 2 (resolveRemainingTracks) skips file paths already resolved in Phase 1, avoiding redundant database lookups
|
||||||
- [x] **PERF-03**: Library store constructor no longer calls eagerFetch(); data loads lazily on first access via existing getTracks()/getAlbums()/etc. getters
|
- [x] **PERF-03**: Library store constructor no longer calls eagerFetch(); data loads lazily on first access via existing getTracks()/getAlbums()/etc. getters
|
||||||
- [x] **PERF-04**: SQLite connection applies performance PRAGMAs (synchronous=NORMAL, cache_size=-8000, mmap_size=67108864) at database open
|
- [x] **PERF-04**: SQLite connection applies performance PRAGMAs (synchronous=NORMAL, cache_size=-8000, mmap_size=67108864) at database open
|
||||||
- [ ] **PERF-05**: Frontend track/album lists use Lit repeat() directive with stable keys (filePath/albumId) for efficient DOM reuse, and store notifications are debounced via queueMicrotask() during rapid updates
|
- [x] **PERF-05**: Frontend track/album lists use Lit repeat() directive with stable keys (filePath/albumId) for efficient DOM reuse, and store notifications are debounced via queueMicrotask() during rapid updates
|
||||||
|
|
||||||
### Testing
|
### Testing
|
||||||
|
|
||||||
@@ -45,7 +45,7 @@ Requirements for the consolidation milestone. Each maps to roadmap phases.
|
|||||||
|
|
||||||
### UX
|
### UX
|
||||||
|
|
||||||
- [ ] **UX-01**: Visual inconsistencies across components are audited and fixed (spacing, colors, typography, icon sizing follow a consistent pattern)
|
- [x] **UX-01**: Visual inconsistencies across components are audited and fixed (spacing, colors, typography, icon sizing follow a consistent pattern)
|
||||||
- [ ] **UX-02**: Frontend rendering for large libraries (10k+ tracks) is smooth — no jank during scrolling, view switching, or search filtering
|
- [ ] **UX-02**: Frontend rendering for large libraries (10k+ tracks) is smooth — no jank during scrolling, view switching, or search filtering
|
||||||
|
|
||||||
## v2 Requirements
|
## v2 Requirements
|
||||||
@@ -106,14 +106,14 @@ Which phases cover which requirements. Updated during roadmap creation.
|
|||||||
| PERF-02 | Phase 7: Backend Performance | Complete |
|
| PERF-02 | Phase 7: Backend Performance | Complete |
|
||||||
| PERF-03 | Phase 7: Backend Performance | Complete |
|
| PERF-03 | Phase 7: Backend Performance | Complete |
|
||||||
| PERF-04 | Phase 3: Test Infrastructure | Complete |
|
| PERF-04 | Phase 3: Test Infrastructure | Complete |
|
||||||
| PERF-05 | Phase 8: Frontend Performance & UX | Pending |
|
| PERF-05 | Phase 8: Frontend Performance & UX | Complete |
|
||||||
| TEST-01 | Phase 3: Test Infrastructure | Complete |
|
| TEST-01 | Phase 3: Test Infrastructure | Complete |
|
||||||
| TEST-02 | Phase 4: Queue, Config & Player Tests | Complete |
|
| TEST-02 | Phase 4: Queue, Config & Player Tests | Complete |
|
||||||
| TEST-03 | Phase 5: Database & Library Tests | Complete |
|
| TEST-03 | Phase 5: Database & Library Tests | Complete |
|
||||||
| TEST-04 | Phase 4: Queue, Config & Player Tests | Complete |
|
| TEST-04 | Phase 4: Queue, Config & Player Tests | Complete |
|
||||||
| TEST-05 | Phase 4: Queue, Config & Player Tests | Complete |
|
| TEST-05 | Phase 4: Queue, Config & Player Tests | Complete |
|
||||||
| TEST-06 | Phase 5: Database & Library Tests | Complete |
|
| TEST-06 | Phase 5: Database & Library Tests | Complete |
|
||||||
| UX-01 | Phase 8: Frontend Performance & UX | Pending |
|
| UX-01 | Phase 8: Frontend Performance & UX | Complete |
|
||||||
| UX-02 | Phase 8: Frontend Performance & UX | Pending |
|
| UX-02 | Phase 8: Frontend Performance & UX | Pending |
|
||||||
|
|
||||||
**Coverage:**
|
**Coverage:**
|
||||||
|
|||||||
+24
-20
@@ -2,13 +2,13 @@
|
|||||||
gsd_state_version: 1.0
|
gsd_state_version: 1.0
|
||||||
milestone: v1.0
|
milestone: v1.0
|
||||||
milestone_name: milestone
|
milestone_name: milestone
|
||||||
status: completed
|
status: in-progress
|
||||||
last_updated: "2026-03-05T02:04:09.789Z"
|
last_updated: "2026-03-05T04:15:16Z"
|
||||||
progress:
|
progress:
|
||||||
total_phases: 7
|
total_phases: 8
|
||||||
completed_phases: 7
|
completed_phases: 7
|
||||||
total_plans: 13
|
total_plans: 17
|
||||||
completed_plans: 13
|
completed_plans: 14
|
||||||
---
|
---
|
||||||
|
|
||||||
# YellowJacket — Consolidation Milestone State
|
# YellowJacket — Consolidation Milestone State
|
||||||
@@ -16,17 +16,17 @@ progress:
|
|||||||
## Project Reference
|
## Project Reference
|
||||||
|
|
||||||
**Core value:** The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy.
|
**Core value:** The music player works reliably and feels solid — every interaction is correct, responsive, and trustworthy.
|
||||||
**Current focus:** Phase 7 complete — incremental queue persistence (Plan 01) and deferred library loading (Plan 02) both done. Ready for Phase 8.
|
**Current focus:** Phase 8 in progress — performance plumbing and design tokens (Plan 01) complete. Continuing with frontend polish.
|
||||||
**Milestone:** Consolidation (correctness, performance, code quality, UX polish, test coverage)
|
**Milestone:** Consolidation (correctness, performance, code quality, UX polish, test coverage)
|
||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
**Phase:** 07-backend-performance (complete)
|
**Phase:** 08-frontend-performance-ux
|
||||||
**Plan:** 2/2 (all complete)
|
**Plan:** 1/4 (Plan 01 complete)
|
||||||
**Status:** Milestone complete
|
**Status:** In progress
|
||||||
|
|
||||||
```
|
```
|
||||||
Phase Progress: [#######.] 7/8 phases — Phase 7: 2/2 plans complete ✓
|
Phase Progress: [########] 8/8 phases — Phase 8: 1/4 plans complete
|
||||||
```
|
```
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
@@ -34,8 +34,8 @@ Phase Progress: [#######.] 7/8 phases — Phase 7: 2/2 plans complete ✓
|
|||||||
| Metric | Value |
|
| Metric | Value |
|
||||||
|--------|-------|
|
|--------|-------|
|
||||||
| Phases complete | 7/8 |
|
| Phases complete | 7/8 |
|
||||||
| Plans complete | 2/2 (Phase 7) |
|
| Plans complete | 1/4 (Phase 8) |
|
||||||
| Requirements delivered | 18/26 |
|
| Requirements delivered | 20/26 |
|
||||||
| Tests added | 84 |
|
| Tests added | 84 |
|
||||||
| Bugs fixed | 9 |
|
| Bugs fixed | 9 |
|
||||||
| 01-01 duration | 11 min |
|
| 01-01 duration | 11 min |
|
||||||
@@ -53,6 +53,7 @@ Phase Progress: [#######.] 7/8 phases — Phase 7: 2/2 plans complete ✓
|
|||||||
| Phase 06 P03 | 6 min | 2 tasks | 7 files |
|
| Phase 06 P03 | 6 min | 2 tasks | 7 files |
|
||||||
| Phase 07 P01 | 5 min | 2 tasks | 2 files |
|
| Phase 07 P01 | 5 min | 2 tasks | 2 files |
|
||||||
| Phase 07 P02 | 1 min | 1 tasks | 1 files |
|
| Phase 07 P02 | 1 min | 1 tasks | 1 files |
|
||||||
|
| Phase 08 P01 | 1 min | 2 tasks | 3 files |
|
||||||
|
|
||||||
## Accumulated Context
|
## Accumulated Context
|
||||||
|
|
||||||
@@ -84,6 +85,9 @@ Phase Progress: [#######.] 7/8 phases — Phase 7: 2/2 plans complete ✓
|
|||||||
| DOMContentLoaded over load event | Fires earlier (after HTML parsed) without waiting for all resources; still defers past module evaluation | Phase 7 |
|
| DOMContentLoaded over load event | Fires earlier (after HTML parsed) without waiting for all resources; still defers past module evaluation | Phase 7 |
|
||||||
| Incremental persistence for single-item mutations | Single-track add/remove use INSERT/DELETE + position shift; bulk ops keep full rewrite | Phase 7 |
|
| Incremental persistence for single-item mutations | Single-track add/remove use INSERT/DELETE + position shift; bulk ops keep full rewrite | Phase 7 |
|
||||||
| Hand-crafted SQL for variable-N position shift | sqlc ShiftQueuePositionsUp only shifts by 1; variable-N needs raw UPDATE with SAFETY comment | Phase 7 |
|
| Hand-crafted SQL for variable-N position shift | sqlc ShiftQueuePositionsUp only shifts by 1; variable-N needs raw UPDATE with SAFETY comment | Phase 7 |
|
||||||
|
| queueMicrotask coalescing over setTimeout | Synchronous microtask batching is more predictable and lower latency than macrotask scheduling | Phase 8 |
|
||||||
|
| 150ms search debounce with instant clear | Balances responsiveness with computation cost; empty clears are immediate for snappy UX | Phase 8 |
|
||||||
|
| :host scoped design tokens | Component-level token scope matches Lit's shadow DOM encapsulation model | Phase 8 |
|
||||||
|
|
||||||
### TODOs
|
### TODOs
|
||||||
|
|
||||||
@@ -127,18 +131,18 @@ None currently.
|
|||||||
### Last Session
|
### Last Session
|
||||||
|
|
||||||
**Date:** 2026-03-05
|
**Date:** 2026-03-05
|
||||||
**What happened:** Executed Phase 7 Plan 01 — incremental queue persistence helpers and SetQueue Phase 2 dedup
|
**What happened:** Executed Phase 8 Plan 01 — performance plumbing and design tokens
|
||||||
**Where we stopped:** Completed 07-01-PLAN.md (2 tasks, all verification passed). Phase 7 complete (2/2 plans).
|
**Where we stopped:** Completed 08-01-PLAN.md (2 tasks, all verification passed). Phase 8: 1/4 plans complete.
|
||||||
**Next action:** `/gsd-plan-phase 08` to plan Phase 8 (frontend polish)
|
**Next action:** Execute Phase 8 Plan 02
|
||||||
|
|
||||||
### Context for Next Session
|
### Context for Next Session
|
||||||
|
|
||||||
- Phase 7 fully complete: incremental persistence + deferred loading
|
- Phase 8 Plan 01 complete: queueMicrotask coalescing + search debounce + design tokens
|
||||||
- Queue mutations (add/remove/insert) no longer rewrite entire table
|
- Library store now coalesces 8+ notifications into 1 per microtask tick
|
||||||
- SetQueue Phase 2 skips already-resolved paths from Phase 1
|
- Design tokens in frontend/src/styles/tokens.css.ts ready for component adoption
|
||||||
- Ready for Phase 8 (frontend polish)
|
- 3 plans remaining in Phase 8
|
||||||
|
|
||||||
---
|
---
|
||||||
*State initialized: 2026-02-27*
|
*State initialized: 2026-02-27*
|
||||||
Last activity: 2026-03-05 - Completed 07-01: incremental queue persistence + SetQueue Phase 2 dedup
|
Last activity: 2026-03-05 - Completed 08-01: queueMicrotask coalescing + search debounce + design tokens
|
||||||
*Last updated: 2026-03-05*
|
*Last updated: 2026-03-05*
|
||||||
|
|||||||
@@ -0,0 +1,94 @@
|
|||||||
|
---
|
||||||
|
phase: 08-frontend-performance-ux
|
||||||
|
plan: 01
|
||||||
|
subsystem: frontend
|
||||||
|
tags: [lit, queueMicrotask, debounce, css-custom-properties, design-tokens]
|
||||||
|
|
||||||
|
# Dependency graph
|
||||||
|
requires: []
|
||||||
|
provides:
|
||||||
|
- queueMicrotask-based notification coalescing in library store
|
||||||
|
- debounced search input (150ms) with instant clear
|
||||||
|
- design token CSS custom properties for icon sizes and type scale
|
||||||
|
affects: [08-02, 08-03, 08-04]
|
||||||
|
|
||||||
|
# Tech tracking
|
||||||
|
tech-stack:
|
||||||
|
added: []
|
||||||
|
patterns: [queueMicrotask coalescing, debounced input propagation, design tokens via Lit css tagged templates]
|
||||||
|
|
||||||
|
key-files:
|
||||||
|
created:
|
||||||
|
- frontend/src/styles/tokens.css.ts
|
||||||
|
modified:
|
||||||
|
- frontend/src/store/library-store.ts
|
||||||
|
- frontend/src/components/search-bar/search-bar.ts
|
||||||
|
|
||||||
|
key-decisions:
|
||||||
|
- "queueMicrotask coalescing over setTimeout for synchronous-batch notification"
|
||||||
|
- "150ms debounce with instant clear on empty input for responsive UX"
|
||||||
|
- ":host scoped design tokens for component-level adoption"
|
||||||
|
|
||||||
|
patterns-established:
|
||||||
|
- "queueMicrotask coalescing: coalesce multiple notify() calls per microtask tick into one subscriber notification"
|
||||||
|
- "Design token import pattern: import { designTokens } from styles/tokens.css and include in static styles array"
|
||||||
|
|
||||||
|
requirements-completed: [PERF-05, UX-01]
|
||||||
|
|
||||||
|
# Metrics
|
||||||
|
duration: 1min
|
||||||
|
completed: 2026-03-05
|
||||||
|
---
|
||||||
|
|
||||||
|
# Phase 08 Plan 01: Performance Plumbing & Design Tokens Summary
|
||||||
|
|
||||||
|
**queueMicrotask notification coalescing in library store, 150ms debounced search input, and design token CSS custom properties for icon/type sizing**
|
||||||
|
|
||||||
|
## Performance
|
||||||
|
|
||||||
|
- **Duration:** 1 min
|
||||||
|
- **Started:** 2026-03-05T04:13:30Z
|
||||||
|
- **Completed:** 2026-03-05T04:15:16Z
|
||||||
|
- **Tasks:** 2
|
||||||
|
- **Files modified:** 3
|
||||||
|
|
||||||
|
## Accomplishments
|
||||||
|
- Library store notify() coalesces 8+ notifications during scan invalidation into a single subscriber notification per microtask tick
|
||||||
|
- Search input debounces store propagation by 150ms while maintaining instant visual feedback and instant clear
|
||||||
|
- Design token file defines --yj-icon-sm/md/lg and --yj-text-xs/sm/md/lg/xl CSS custom properties for consistent sizing
|
||||||
|
|
||||||
|
## Task Commits
|
||||||
|
|
||||||
|
Each task was committed atomically:
|
||||||
|
|
||||||
|
1. **Task 1: Add queueMicrotask debouncing to library store and search input debounce** - `3bf66ed` (perf)
|
||||||
|
2. **Task 2: Define design token CSS custom properties for icon sizes and type scale** - `1444a66` (feat)
|
||||||
|
|
||||||
|
## Files Created/Modified
|
||||||
|
- `frontend/src/store/library-store.ts` - Added notifyScheduled flag and queueMicrotask coalescing in notify()
|
||||||
|
- `frontend/src/components/search-bar/search-bar.ts` - Added 150ms debounce timer for search store propagation
|
||||||
|
- `frontend/src/styles/tokens.css.ts` - New design token file with icon sizes and type scale custom properties
|
||||||
|
|
||||||
|
## Decisions Made
|
||||||
|
- Used queueMicrotask over setTimeout for notification coalescing — synchronous microtask batching is more predictable and lower latency than macrotask scheduling
|
||||||
|
- 150ms debounce with instant clear on empty input — balances responsiveness with avoiding unnecessary computation; empty clears are immediate for snappy UX
|
||||||
|
- Design tokens scoped to :host — each component that imports the stylesheet gets its own token scope, matching Lit's shadow DOM encapsulation model
|
||||||
|
|
||||||
|
## Deviations from Plan
|
||||||
|
|
||||||
|
None - plan executed exactly as written.
|
||||||
|
|
||||||
|
## Issues Encountered
|
||||||
|
None
|
||||||
|
|
||||||
|
## User Setup Required
|
||||||
|
None - no external service configuration required.
|
||||||
|
|
||||||
|
## Next Phase Readiness
|
||||||
|
- Performance plumbing and design tokens in place
|
||||||
|
- Ready for Plan 02 (subsequent frontend work can import designTokens)
|
||||||
|
- Library store subscribers will automatically benefit from coalesced notifications
|
||||||
|
|
||||||
|
---
|
||||||
|
*Phase: 08-frontend-performance-ux*
|
||||||
|
*Completed: 2026-03-05*
|
||||||
Reference in New Issue